Footings and Frost Wall, and Fill
Yesterday at the property the wood was taken off of the footings, and the chalk lines were drawn on them to show where the walls would lay.
Today the foundation crew was back and they put up more wood to pour the walls to bring the frost wall around the walk out up to ground level.
The engineers came and gave their approval, so that was good. Meaning that the wall actually got poured this afternoon. Tomorrow the frost wall will be stripped of the wood that went up today. Also, 15-20 loads of clean fill will be coming in and stored for when we need it.